Title:
ToR National Expert ECE and SRP Infrastructure -Special Consultant
- The infrastructure national
expert position is based on 2 contracted deliverables, with the final one
paid upon acceptance by August 30, 2025.
- Salary Range: $3,000 - $4,500.
Georgia
Innovation, Inclusion and Quality Project (I2Q)
TERMS
OF REFERENCE
Short-Term Consultant (National)
for Supporting Revision and fine-tuning of existing draft of ECE and SRP
settings’ Infrastructure Technical Regulation under the ongoing contract
№GE-MESCS-212213-CS-QCBS “Improving ECE Institution Management System and
Enhancing the Quality of Programs Across the Country”
The salary range for
this position is $3,000 - $4,500 depending upon qualifications and is
non-negotiable.
Background
The Government of Georgia (GoG) has signed the Loan
Agreement (LA) for financing the implementation of Innovation, Inclusion and
Quality Project (Project) with the International Bank of Reconstruction and
Development (IBRD) in June 2018. The Project development objectives along with
improving other levels of education, is to (i) expand access to preschool
education;
The Project consists of five key components and
subcomponents. First Component regards to Improving Quality of and Access to
Early Childhood Education:
Component 1-
Improving Quality
of and Access to Early Childhood Education;
The objective of this component
is to provide support
to facilitate expanded access to quality pre-school education in selected
pre-schools.
Subcomponent 1.1. Improving the quality of ECE
programs across the country
Subcomponent 1.2 Increasing equitable access to
preschool education for successful transition to school
Subcomponent 1.3 Improving infrastructure to support
innovative primary education, including preschool
The Activities are being implemented over a 43 months
period by the San Diego State University Research Foundation, in
sub-consultancy with Center for International Education.
Objective of the assignment
The objective of this assignment is to provide support
to SDSU for the purpose of revising and fine-tuning the existing draft of ECE and SRP settings’
Infrastructure Technical Regulation as a task agreed within the
implementation of “Improving Early Childhood Education (ECE) institution
Management System and Enhancing the Quality of Programs Across the Country”
under the Component 1 of the I2Q project.
Short-Term Consultant is expected to submit the
required deliverable into two parts:
Ø
Deliverable 1
(D1) _ Initial draft of revised and fine-tuned ECE and SRP settings’
Infrastructure Technical Regulation – two months after commencement of works.
Ø
Deliverable 2
(D2) _Final project document of revised and fine-tuned ECE and SRP settings’
Infrastructure Technical Regulation – one month after acceptance of Deliverable
1.
Scope of Work
Under the supervision of SDSU ECE Tbilisi office local
manager and with the close collaboration
of ECE Component Lead of the PMU, the Consultant will be working as the Short-Term
local expert hired by SDSU to conduct works for analyzing existing draft of ECE
and SRP settings’ Infrastructure Technical Regulation to support and enhance
the process of finalization and longed for adoption of aforementioned technical
regulation.
Under this assignment the Consultant will be responsible
for:
Ø Analyze the existing
draft of ECE and SRP settings’ Infrastructure Technical Regulation;
Ø Analyze the existing
Standards for Buildings and Structures of General Educational Institutions;
Ø In the light of
analysis of both afore-listed documents, reflect with comments for
modernization and fine-tuning on the existing draft of ECE and SRP settings’
Infrastructure Technical Regulation to refine it in total alignment with Chapter
3- “Main Requirements for Designing the Part of Building Intended for the
School Readiness Programme” of the existing Standards for Buildings and
Structures of General Educational Institutions, as well as with the ECE and SRP
institutions’ authorization standard;
Ø In the light of
analysis, make detailed comments for modernization, necessary adjustments, and precise
recommendations to fine-tune the existing draft of ECE and SRP settings’ Infrastructure
Technical Regulation;
Ø Develop a short
report on findings of the analysis and issued recommendations for improvement.
Ø After submission of each
of the afore-listed deliverables (D1 and D2), collect the feedback from the ECE
Component Lead of the I2Q Project and SDSU experts and respectively improve and
amend the reports.
Expected Outputs
Expected outputs of the assignment for Improving ECE
Institution Management System and Enhancing the Quality of Programs Across the
Country:
Ø The analysis of the existing
draft of ECE and SRP settings’ Infrastructure Technical Regulation’s.
Ø Revised and
fine-tuned project document of ECE and SRP settings’ Infrastructure Technical
Regulation with detailed comments for modernization, necessary amendments and
precise recommendations.
Ø Progress Report on
conducted thorough work and issued and applied recommendations for improvement.
Consultant shall
collaborate closely with the assigned international and local experts of the GE-MESCS-212213-CS-QCBS
contract with SDSU, as well as with the ECE Component Lead of the I2Q Project,
and support to the following:
Ø The Consultant shall
thoroughly analyze the existing draft of ECE and SRP settings’ Infrastructure
Technical Regulation, and Chapter 3- “Main Requirements for Designing the
Part of Building Intended for the School Readiness Programme” of the
existing Standards for Buildings and Structures of General Educational
Institutions. Cross-check the norms and regulations in above-mentioned
documents. The comments for modernization and recommendations for improvement
must be formulated so that the smooth transition between the draft of ECE and
SRP settings’ Infrastructure Technical Regulation and Chapter 3- “Main
Requirements for Designing the Part of Building Intended for the School
Readiness Programme” of the existing Standards for Buildings and Structures
of General Educational Institutions is ensured. Accordingly, every recommendation
for improvement and comments for modernization either on expansion, or
shortening of the norms and regulations stipulated in the existing draft of ECE
and SRP settings’ Infrastructure Technical Regulation must be solidified with
relevant justification;
Ø Throughout the
fine-tuning of the existing draft of ECE and SRP settings’ Infrastructure
Technical Regulation, the Consultant should ascertain close array with the
existing, adopted ECE and SRP institutions’ authorization standard.
Ø In close
collaboration with below-listed key stakeholders and beneficiaries of the task
outcomes, the Consultant must ensure development of detailed Progress Report on
conducted thorough work and issued and applied recommendations for improvement.
The Consultant is expected to arrange and hold
consultation meetings with key stakeholders and beneficiaries of the task
outcomes, namely with representatives of Preschool Education and Care Quality
Assurance Department of NCEQE, ECE and GE Development Department and ECE
Division of the MESY, Infrastructure Project Coordinator – Engineer of the I2Q
Project.
The works shall be planned and implemented under
supervision of PMU and assigned SDSU international and local experts.
All documents developed during this assignment are
intended for internal use only and shall not be disclosed for the third
party/parties during the assignment and at least 1 month after its completion.
The Consultant will sign the respective nondisclosure declaration.
The necessary standards and drafts shall and will be
provided by the ECE Component Lead of the I2Q Project.